Projects That Prove Our Expertise

From Design Challenges to Proven Results

Discover how Max Span’s Voided Slab Systems have enhanced project efficiency — by reducing weight and material consumption, enabling longer spans, and accelerating construction.These projects reflect real, measurable results — backed by engineering expertise and integrated support, ensuring quality execution and optimal structural performance

Projects Overview

Explore how Max Span’s Voided Slab Systems solve structural challenges through efficient design, optimized material use, and reliable execution.

Sky Project - Ramallah

Sky Project - Ramallah

A mixed-use development requiring large spans and high structural performance, executed using the Foermli System to achieve design flexibility and advanced structural efficiency.

Area

11,000 m²

Maximum Span

13 m

Slab thickness

35 cm

Total loads

LL=2.5 KN/M2
SDL=4.5 KN/M2

KEY ACHIEVEMENT

Achieving wide spans with reduced loads and improved slab efficiency, while maintaining optimized thickness and stable structural performance.

برج ماريا مجموعة عادل المصري

Maria Tower – Adel Al-Masri Group

A residential tower executed using the D-MAX System to achieve balanced structural efficiency with faster execution and improved site organization.

Area

10,000 m²

Maximum Span

8 m

Slab thickness

28 cm

Total loads

LL=2.5 KN/M2
SDL=4.5 KN/M2

KEY ACHIEVEMENT

Balancing execution speed and structural performance, with reduced slab weight and improved workflow on site.

فلانة 3 رام الله

Falaneh 3 – Ramallah

A residential project executed using the D-MAX System to enhance efficiency while improving construction speed and reducing structural loads.

Area

4,500 m²

Maximum Span

8 m

Slab thickness

28 cm

Total loads

LL=2.5 KN/M2
SDL=4.5 KN/M2

KEY ACHIEVEMENT

Stable structural performance with reduced slab weight and faster on-site execution.

مجمع مسك نابلس

Misk Complex – Nablus

A mixed-use commercial and residential project executed using the D-MAX System to achieve higher efficiency, faster execution, and reduced material consumption.

Area

10,000 m²

Maximum Span

9 m

Slab thickness

29 cm

Total loads

LL=5 KN/M2
SDL=4 KN/M2

KEY ACHIEVEMENT

Balanced structural efficiency and execution speed, with reduced loads and improved overall project performance.

مبنى غسان عبد الحق وشركاؤه نابلس

Ghassan Abdel Haq & Partners Building – Nablus

A commercial project executed using the D-MAX System to achieve high structural efficiency and enable wider spans with improved slab performance.

Area

8,000 m²

Maximum Span

10 m

Slab thickness

30 cm

Total loads

LL=5 KN/M2
SDL=4 KN/M2

KEY ACHIEVEMENT

Wider spans with reduced loads and enhanced structural efficiency, while maintaining execution quality and speed.

Birzeit University

An educational project requiring large spans and high structural performance.
Executed using the Foermli System to achieve efficiency and long-Span capability.

Area

3,000 m²

Maximum Span

20 m

Slab thickness

48 cm

Total loads

LL=5 KN/M2
SDL=5 KN/M2

KEY ACHIEVEMENT

Achieving long spans with optimized slab thickness and stable structural performance.

American University

A large-scale educational development executed using the Foermli System to balance structural efficiency with reduced slab thickness.

Area

9,000 m²

Maximum Span

15 m

Slab thickness

35 cm

Total loads

LL=5 KN/M2
SDL=5 KN/M2

KEY ACHIEVEMENT

Efficient structural design with reduced thickness while maintaining performance.

فندق سانت هيلين

St. Helen Hotel

A hospitality project executed using the Foermli System to ensure structural efficiency and optimized spans.

Area

16,000 m²

Maximum Span

9 m

Slab thickness

30 cm

Total loads

LL=4 KN/M2
SDL=4.5 KN/M2

KEY ACHIEVEMENT

Balanced structural performance with optimized material usage.

حياة مول الخليل

Hayat Mall – Hebron

A large commercial project executed using the D-MAX System to enhance efficiency and support varying spans.

Area

75,000 m²

Maximum Span

11 m

Slab thickness

36 cm

Total loads

LL=5 KN/M2
SDL=4.5 KN/M2

KEY ACHIEVEMENT

Efficient execution across large areas with optimized spans and material usage.

Rafidia Commercial Center

A commercial development executed using the D-MAX System to achieve consistent performance and optimized spans.

Area

13,000 m²

Maximum Span

10 m

Slab thickness

32 cm

Total loads

LL=5 KN/M2
SDL=4.5 KN/M2

KEY ACHIEVEMENT

Reliable structural performance with balanced efficiency and execution speed.

مستشفى عين كارم الخليل

Ein Karem Hospital – Hebron

A hospital project requiring high structural efficiency to achieve wide spans while maintaining stability and performance.
The Foermli System was utilized to reduce weight and enhance slab efficiency.

Area

6,000 m²

Maximum Span

10 m

Slab thickness

32 cm

Total loads

LL=5 KN/M2
SDL=4 KN/M2

مشروع الليوان رام الله

Al Liwan Project – Ramallah

A mixed-use residential and commercial project with large open spaces, executed using the Foermli System to achieve longer spans and higher structural efficiency while reducing loads.

Area

17,000 m²

Maximum Span

11 m

Slab thickness

32 cm

Total loads

LL=5 KN/M2
SDL=4 KN/M2

مبني جمعية ابناء البيرة - رام الله

Al-Bireh Sons Association Building – Ramallah

A 5,000 m² community building executed with the Foermli System, using 46 cm slabs to achieve exceptional 20 m spans with high structural efficiency.

Area

5,000 m²

Maximum Span

20 m

Slab thickness

46 cm

Total loads

LL=5 KN/M2
SDL=4.5 KN/M2

Manasrah Commercial Complex – Jenin | مجمع مناصرة التجاريي - جنين

Manasrah Commercial Complex – Jenin

A commercial complex in Jenin designed to provide flexible retail and service spaces, with an efficient voided-slab solution supporting open layouts and adaptable use.

Area

12,000 m²

Maximum Span

9 m

Slab thickness

29 cm

Total loads

LL=5 KN/M2
SDL=4 KN/M2

Shepherds’ Field Churches – Bethlehem | مشروع كنائس حقل الرعاة - بيت لحم

Shepherds’ Field Churches Project – Bethlehem

A 2,500 m² religious complex executed with the Foermli System, using 60 cm slabs to achieve 20 m spans while accommodating exceptionally high superimposed loads.

Area

2,500 m²

Maximum Span

20 m

Slab thickness

60 cm

Total loads

LL=5 KN/M2
SDL=18 KN/M2

Orient industrial facility exterior

Orient Company Factory – Bethlehem

A 6,000 m² industrial facility executed with the D-MAX System, using 38 cm slabs to achieve 14 m spans and support demanding industrial live loads.

Area

6,000 m²

Maximum Span

14 m

Slab thickness

38 cm

Total loads

LL=12 KN/M2
SDL=3.0 KN/M2

مجموعة العمري العقارية جنين

Al-Omari Real Estate Complex – Jenin

An 11,000 m² real-estate complex executed with the D-MAX System, using 31 cm slabs to achieve 10 m spans with efficient load distribution.

Area

11,000 m²

Maximum Span

10 m

Slab thickness

31 cm

Total loads

LL=5 KN/M2
SDL=4 KN/M2

CASE STUDIES / ENGINEERING IN PRACTICE

Real projects.
Measurable impact.

Explore how Foermli influences material efficiency and structural performance. Read the complete design comparison and results for each project.

Shawqi Shaheen Building – Birzeit UniversityFOERMLI SYSTEM

01EDUCATION / BIRZEIT UNIVERSITY

Shawqi Shaheen Building – Birzeit University

Structural Efficiency Through Foermli Voided Slab Technology

22%Less concrete
18%Less reinforcement
20 mMaximum Span
Structural design comparisonRead full case study
Liwan Commercial ProjectFOERMLI SYSTEM

02COMMERCIAL / LIWAN

Liwan Commercial Project

Improving Structural Performance and Architectural Flexibility

15%Less reinforcement
15%Lower slab weight
11 mMaximum Span
Structural design comparisonRead full case study

– Client Success –

Trusted by Industry Leaders

We don’t just supply Systems — we build long-term engineering partnerships through proven performance, technical support, and reliable execution.

“Max Span played a key role in improving our project timeline, with outstanding technical support throughout all phases of execution. They were not just a supplier, but a true engineering partner.”

Project Impact

Real Estate Developer

“The System gave us greater architectural flexibility, helped reduce the number of columns significantly, and improved the overall economic feasibility of the project.”

Eng. Imad Al-Khatib

Director, Rawasi Real Estate Investment

Contracting Company

“Execution was faster compared to traditional Systems, and the technical support and training helped us maintain high quality on site.”

Eng. Mohammad Raddad

Project Manager, AZ Contracting

Engineering Consultant

“Adopting Max Span’s Voided Slab System enabled us to achieve longer spans with a clear reduction in concrete and steel usage.
Engineering support was present from design through to execution.”

Eng. Fouad Shammasneh

Director, Al Rawda Engineering Consultancy

Trusted by leading organizations

Ready to optimize your next project?

Partner with Max Span to achieve lighter structures, reduced material use, and more efficient project execution with complete engineering support.